<p class="MsoNormal"><span style="font-family:Arial">Transmission line report
ready for City Council consideration</span></p><p class="MsoNormal"><span style="font-family:Arial"><br></span></p>

<p class="MsoNormal"><span style="font-family:Arial">The public’s feedback for
the proposed southwestern electric transmission line project has been tabulated
on the second route study (Option B). In July, the City Council will consider
the report of the results and they will direct Columbia Water &amp; Light’s
staff on the next step for the project. This could possibly be a public meeting
on both Option A and Option B. Those interested in knowing when the report is
scheduled for consideration at a Columbia City Council meeting should sign up
for e-mail notification (<a href="https://www.gocolumbiamo.com/Web_Mail/edit-prefs.php?list=electrans-l">https://www.gocolumbiamo.com/Web_Mail/edit-prefs.php?list=electrans-l</a>)
or consult the agenda for the council meetings (<a href="https://www.gocolumbiamo.com/Council/Commissions/meetings.php?bcid=56">https://www.gocolumbiamo.com/Council/Commissions/meetings.php?bcid=56</a>)</span></p>