<div dir="ltr"><div style="font-family:arial,sans-serif;font-size:13px">An interested parties meeting was held at the ARC on July 17, 2013 for the Grindstone Creek Trail Development Project. About 75 people were in attendance. Parks and Recreation staff and an engineer from Allstate Consultants were available to discuss the recommended bridge types and locations that were determined after the recent survey work and hydrological studies conducted by Allstate. The recommended trail alignment along the creek has not changed, except that the engineers were able to confirm the locations and design of the bridges. <br>
</div><div class="im" style="font-family:arial,sans-serif;font-size:12.800000190734863px"><div style="font-size:13px"><br></div><div style="font-size:13px">All the documents on display at the meeting are available on-line - link below. An on-line comment form will be posted from <span class="" tabindex="0"><span class="">July 17-July 24, 2013</span></span> to give those who were unable to attend the meeting an opportunity to comment on the proposed project (see link below).</div>
<div style="font-size:13px"><br></div></div><div style="font-family:arial,sans-serif;font-size:13px"><a href="http://www.gocolumbiamo.com/ParksandRec/Trails/cip_grindstonetrail.php" target="_blank">http://www.gocolumbiamo.com/ParksandRec/Trails/cip_grindstonetrail.php</a></div>
<div style="font-family:arial,sans-serif;font-size:13px"><br></div><div style="font-family:arial,sans-serif;font-size:13px"><br></div><div><br></div><br>
</div>