<div style="margin-top: 20px;"><img src="http://www.como.gov/CMS/pressreleases/citylogo-default.jpg" alt="City of Columbia Logo" width="106" height="116"  style="float: left; margin-right: 20px; margin-left: 0px;">
<img src="http://www.como.gov/CMS/pressreleases/spaceholder.png" alt="spaceholder image" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 105%;">CITY OF COLUMBIA, MISSOURI<br />P.O. BOX 6015 COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<h2 style="font-size: 200%;">FOR IMMEDIATE RELEASE</h2>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">May 17, 2018</p>
<p style="float:right; font-weight:bold; margin-bottom: 75px; font-size: 120%; text-align:right;">CONTACT: Barry Dalton
<br />Columbia Public Works
<br />573.874.2489</p>

</div>
<div style="font-size: 110%; line-height:200%;"><h3 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 170%;">Clark Lane sidewalk project scheduled to begin May 21 with westbound lane closure</h3>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - <p style="display:inline;"><span style="font-weight: 400;">Two federal grants, beginning in 2006, have helped make Columbia one of the country’s best cities for walking, riding and using nonmotorized transportation. After more than 35 Getabout Columbia projects, just three remain to be completed. Those projects are Bike Boulevard (MKT to Parkade), Shepard to Rollins Trail, and the Clark Lane Sidewalk Project. The contractor, S and A Equipment & Builders, plans to begin construction on the Clark Lane Sidewalk Project the week of May 21, weather permitting.</span></p>
<br />
<p><span style="font-weight: 400;">The project includes a sidewalk along the north side of Clark Lane from Route B/Paris Road to Lambeth Drive. This sidewalk will improve the safety of pedestrians along Clark Lane. In addition to the sidewalk, a pedestrian signal and crosswalk will be installed at the intersection of Clark Lane and Highway 63 Connector to make this busy intersection more pedestrian friendly. </span></p>
<br />
<p><span style="font-weight: 400;">No closures are scheduled during the intersection work, but during sidewalk construction the project will be divided into phases to reduce impact on traffic. This will require a shifting lane closure in the westbound lane of Clark Lane with a detour (See attached location diagram for detour route). Construction of the first phase, from Route B/Paris Road to Towne Drive, is scheduled to begin May 21, weather permitting. All phases of the project are estimated to be completed by fall 2018.</span></p>
<br />
<p><span style="font-weight: 400;">"Residences and driveways along Clark Lane will experience some inconveniences during the sidewalk work," Construction Project Superintendent David Fennewald said. "But we are coordinating with the contractor to minimize this, and driveway approaches affected by the construction will be rebuilt."</span></p>
<br />
<p><span style="font-weight: 400;">The total investment for the project is estimated at $1.03 million. An interested parties meeting for the project was held on Feb. 11, 2015 with approval by City Council on Sept. 8, 2015. </span></p>
<br />
<p><strong>Additional Resources:</strong><span style="font-weight: 400;"><br /></span><span style="font-weight: 400;">Capital Improvement Projects: CoMo.gov/PublicWorks/cip-status</span><span style="font-weight: 400;"><br /></span><span style="font-weight: 400;">GetAbout Columbia information: CoMo.gov/PublicWorks/GetAbout<br /></span><span style="font-weight: 400;">City of Columbia Public Involvement Process: CoMo.gov/PublicWorks/Public</span></p></div>
<br />
<div class="content"></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br />http://www.como.gov/CMS/pressreleases/downloadfile.php?id=1959<br />http://www.como.gov/CMS/pressreleases/downloadfile.php?id=1960</div>
</div>
<div id="footerline">
<div style="margin-top: 75px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public through  democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  #pressrelease table, #pressrelease th, #pressrelease td{
border: 0px;
  }
#pressrelease{ margin:40px;}
  .attachments{margin-top: -10px;}
  </style><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
http://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at http://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>