<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<img src="https://www.como.gov/CMS/pressreleases/spaceholder.png" alt="" role="presentation" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<h2 style="font-size: 150%;">FOR IMMEDIATE RELEASE</h2>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">September 24, 2019</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: CONTACT: Barry Dalton 
<br />Community Relations Specialist 
<br />Public Works Department 
<br />City of Columbia 
<br />573.874.7217
<br />Barry.Dalton@CoMo.gov</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h3 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Update: Oak Street to close to through traffic between Sexton Road and Lynn Street beginning Sept. 25</h3>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - <p style="display:inline;"><span style="font-weight: 400;"><strong>UPDATE: </strong><br /><br />BP Paterson, the contractor for the Lynn-Oak-Sexton sidewalk capital improvement project, plans to close Oak Street </span><span style="font-weight: 400;">between Sexton Road and Lynn Street</span><span style="font-weight: 400;"> to through traffic beginning Wednesday, Sept. 25. </span><span style="font-weight: 400;">Residents have been notified and will be able to access their driveways from Oak Street. This closure is necessary for City of Columbia Water & Light to relocate a water line and for the contractor to complete </span><span style="font-weight: 400;">construction of the sidewalk gaps along the block of Lynn Street, Oak Street and Sexton Road.</span></p>

<p><span style="font-weight: 400;">Please watch for updates on social media or online at </span><a href="https://www.como.gov/publicworks/lynn-oak-sexton-sidewalk/"><span style="font-weight: 400;">CoMo.gov/PublicWorks/Lynn-Oak-Sexton-Sidewalk</span></a><span style="font-weight: 400;"> and adhere to signs posted in the work zone. </span><span style="font-weight: 400;">Motorists, nonmotorized transportation users and pedestrians are urged to use extreme caution in the work zone.</span></p>
<p style="display: inline;"><br /><br /><em>Previous Press Release (Sept. 13, 2019):</em><br /><br /><strong>Sidewalk construction on Lynn, Oak, Sexton scheduled to begin Sept. 16</strong><br /><br />BP Paterson, the contractor for the Lynn-Oak-Sexton sidewalk capital improvement project, plans to begin construction Monday, Sept. 16, weather permitting. The project is estimated to take 45 days, weather permitting.</p>
<p>Concrete sidewalks will be constructed to fill in the sidewalk gaps along the block of Lynn Street, Oak Street and Sexton Road. Some lane restrictions and a short-term closure on Oak Street<span class="text_exposed_show"> will be required during the project. Please watch for updates on social media or online at <a href="http://como.gov/PublicWorks/Lynn-Oak-Sexton-sidewalk?fbclid=IwAR3SIwImlA2Uze4MUSoovj253TKhCFAUlXCpX6MfmzqQjwZ9P7geV2KruUc" target="_blank" rel="noopener nofollow" data-ft="{" data-lynx-mode="async" data-lynx-uri="https://l.facebook.com/l.php?u=http%3A%2F%2FCoMo.gov%2FPublicWorks%2FLynn-Oak-Sexton-sidewalk%3Ffbclid%3DIwAR3SIwImlA2Uze4MUSoovj253TKhCFAUlXCpX6MfmzqQjwZ9P7geV2KruUc&h=AT0AVNI6OBoBdfAjrM6K6_cUPOPJVDLEWbsubI3z08BANH9uhqe1XGoYs740Yexta6n7pgjd2mGk0tpKAS8zX-Lvleatwn0c2TPhD1gH1wUT-NOPKeCEqvmhNxIVcpVEtJ1SwE2fjm5uRLdn-nci0kvW43E4jAOiYOkEGStFQpaDSCp4VlcuG5f88XAbgqHNwyV0oTM5y9R12wDB-bo0LdYsTEP3MrTr9e_6MNHmmQe5F28t23UvD0_piJoxgGTFaPJMharpI_GRA
 
 XEaFZlr1pGNz5b0UOo4CyAMtJoCx04JkBGoDfznV4HKqo_H7qt4zhZ9ROJI5vc6km5Ch7WWj2r-1GHUktQS5ZGkGkVq6p4ZYwgI60Q_Zc5Tx4PKQjMy1FkLEA62iLr4c5xCI1ickIwwmtno0XsdrdrFhzIaEQL6ktnRw6gDesIidi3i-y1XjT4y-tNo_bMFwzQhxI3FvXiw8aRSfIbe2OVvhWKnRPq7-IpdIw7r7L0sYOHFHVW7gvH1EmiycpFvPEJxtyrtKHFaFq5yZ3J3H3jTRvwZDK6EOd3baeJYqoDP8lExLazxifAoFmwWet5BJi-16ZWn2Lr6_3IC1QtmG1DIqCJr">CoMo.gov/PublicWorks/Lynn-Oak-Sexton-sidewalk</a> and adhere to signs posted in the work zone.</span></p>
<div class="text_exposed_show">
<p>The estimated investment is $213,000 paid for through the 2015 Capital Improvement Sales Tax ballot and a Community Development Block Grant. An interested parties meeting was held Nov. 15, 2016, and a public hearing before City Council took place Aug. 7, 2017.</p>
<p>Motorists, nonmotorized transportation users and pedestrians are urged to use extreme caution in the work zone. Pedestrians will need to use alternate routes.</p>
</div></div>
<br />
<div class="content"></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br /><a href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=2262">Location Diagram</a></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public through  democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  #pressrelease table, #pressrelease th, #pressrelease td{
border: 0px;
  }
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
http://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at http://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>