<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<img src="https://www.como.gov/CMS/pressreleases/spaceholder.png" alt="" role="presentation" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<h2 style="font-size: 150%;">FOR IMMEDIATE RELEASE</h2>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">October 24, 2019</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: CONTACT: Barry Dalton 
<br />Community Relations Specialist 
<br />Public Works Department 
<br />City of Columbia 
<br />573.874.7217
<br />Barry.Dalton@CoMo.gov</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h3 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Green Meadows and Forum Boulevard intersection improvement project scheduled to open 30 days ahead of schedule on Oct. 25</h3>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - <p style="display:inline;"><span style="font-weight: 400;">The Green Meadows and Forum Boulevard intersection improvement project is scheduled to open ahead of schedule on Friday, Oct. 25, weather permitting.</span></p>

<p><span style="font-weight: 400;">Green Meadows Road is a two-lane street intersecting with a four-lane divided roadway at Forum Boulevard resulting in what had been an all-way stop with six lanes of busy traffic. </span><span style="font-weight: 400;">The intersection was identified in the City of Columbia’s 10-year plan for the 2015 Capital Improvement Sales Tax as needing improvement. The goal of the project was to increase safety and reduce congestion by removing the all-way stop and constructing the roundabout. </span></p>

<p><span style="font-weight: 400;">"Most importantly, the Forum and Green Meadows Roundabout provides a safer intersection for pedestrians, nonmotorized transportation users and motorists," Public Works Director David Nichols said. "We really appreciated the public’s patience and support during the construction process and the related road closures. It was a community effort."</span></p>

<p><span style="font-weight: 400;">The intersection improvement project included a partial dual-lane roundabout, utilities, sidewalks, crosswalks, pedestrian safety islands, street lighting and stormwater improvements. Emery Sapp and Sons, Inc. began construction of the roundabout on July 8 with an estimated construction schedule of 150 days. If everything stays on track, the project should be completed at least 30 days ahead of the original plan. This includes some additional work scheduled to occur on Forum Boulevard over the next 1-2 weeks to remove the temporary crossover lanes and finish seeding the median. While the crossovers are being removed, there will continue to be some temporary lane restrictions in the area. </span></p>

<p><span style="font-weight: 400;">"Completely closing one side of Green Meadows Lane at Forum Boulevard while working on that side of the roundabout provided the space and safety needed to complete the project ahead of schedule," Public Works Construction Superintendent David Fennewald said. "</span><span style="font-weight: 400;">Additionally, the contractor and all of the City staff involved in the project did a really great job."</span></p>

<p><span style="font-weight: 400;">The Country Club Villas II Homeowners Association has agreed to adopt the landscaping in the roundabout and will be maintaining it through Grizzly Bear Landscaping. </span></p>

<p><span style="font-weight: 400;">After a series of public meetings and hearings, and considering a number of options, the Columbia City Council approved the new roundabout at Forum Boulevard and Green Meadows Road on Sept. 5, 2017, as part of the City of Columbia’s Capital Improvement Program. Roundabouts are not only an effective way to deal with challenging intersections, but they are also nationally recognized as a way to improve safety. </span></p>

<p><span style="font-weight: 400;">Two interested parties meetings were held April 28, 2016, and June 27, 2017, and a neighborhood meeting concerning traffic calming on Canterbury Drive and Scottson Way was held Sept. 18, 2018. Two public hearings before City Council took place Sept. 6, 2016, and Sept. 5, 2017. The estimated investment was $1.2 million. </span></p>

<p><span style="font-weight: 400;">For more information about the project, visit </span><a href="http://como.gov/PublicWorks/Forum-Greenmeadows"><span style="font-weight: 400;">CoMo.gov/PublicWorks/Forum-GreenMeadows</span></a><span style="font-weight: 400;">. </span></p>
<p><span style="font-weight: 400;">For more information about roundabout benefits and driving tips, visit </span><a href="https://www.como.gov/publicworks/roundabout-education/"><span style="font-weight: 400;">CoMo.gov/PublicWorks/Roundabout-Education</span></a><span style="font-weight: 400;">.</span><br /><br /></p></div>
<br />
<div class="content"></div>
<br />
<div class="attachments"></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public through  democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  #pressrelease table, #pressrelease th, #pressrelease td{
border: 0px;
  }
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
http://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at http://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>