<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-utilities.png" alt="City of Columbia Missouri Utilities" width="175" height="101"  style="margin-right: 5px;">
<img src="https://www.como.gov/CMS/pressreleases/spaceholder.png" alt="" role="presentation" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">December 30, 2019</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: Tom Wellman 
<br />Project Engineer 
<br />Stormwater Utility
<br />City of Columbia 
<br />573.874.7587</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Interested parties meeting regarding Leslie Lane Stormwater Improvements project scheduled for Jan. 13</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - <p style="display:inline;">The City of Columbia Stormwater Utility is holding an interested parties meeting Monday, Jan. 13, from 5:30 to 6:30 p.m., in Conference Room 1C of City Hall, 701 E. Broadway, to discuss the upcoming Leslie Lane Stormwater Improvements project. </p>
<br />
<p><span style="font-weight: 400;">The purpose of this meeting is to present the plans for the construction of a new stormwater culvert pipe under Leslie Lane, designated as Leslie Lane Stormwater Improvements. This project proposes replacing the two existing stormwater inlets and the 48-inch corrugated metal pipe (CMP) culvert under Leslie Lane with two low clog stormwater inlets and a 60-inch high-density polyethylene plastic (HDPE) culvert pipe. This project also proposes replacing an existing 24-inch CMP stormwater pipe with a 24-inch HDPE stormwater pipe near the Leslie Lane and North Garth Avenue intersection</span></p>
<br />
<p><span style="font-weight: 400;">The proposed plan will be available for public review and City staff will be present to answer questions.</span></p></div>
<br />
<div class="content"></div>
<br />
<div class="attachments"></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public through  democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  #pressrelease table, #pressrelease th, #pressrelease td{
border: 0px;
  }
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
http://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at http://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>