<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<img src="https://www.como.gov/CMS/pressreleases/spaceholder.png" alt="" role="presentation" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">March 6, 2020</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: Barry Dalton 
<br />Community Relations Specialist 
<br />Public Works Department 
<br />City of Columbia 
<br />573.874.7217
<br />Barry.Dalton@CoMo.gov 
<br />
<br />Vineet Kapila 
<br />Right of Way Technician 
<br />Community Development 
<br />City of Columbia 
<br />573.874.7474
<br />Vineet.Kapila@CoMo.gov</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Overnight crack seal operations planned on North Providence, Nifong intersections beginning March 9</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - <p style="display:inline;">City of Columbia Public Works plans to perform crack sealing operations on North Providence Road, between Blue Ridge Road and Rain Forest Parkway, and several intersections in south Columbia, beginning March 9, weather permitting. This work is scheduled to take place during the overnight hours from 8:30 p.m. to 7 a.m.  </p>
<br />
<p><span style="font-weight: 400;">Crack sealing involves using a liquid asphalt substance to seal minor cracks along asphalt and concrete streets and between concrete panels. Sealing the cracks reduces the infiltration of water and subsequent roadway damage from freezing and thawing.  While labor-intensive, crack sealing is one of the most beneficial forms of pavement preservation treatments.Work is currently planned at or near the following intersections:</span></p>
<br />
<ul>
<li style="font-weight: 400;"><span style="font-weight: 400;">Green Meadows Road and Providence Road</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Nifong Boulevard and Providence Road</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Nifong Boulevard and Bethel Street</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Nifong Boulevard and Forum Boulevard</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Nifong Boulevard and Sinclair Street</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Nifong Boulevard and Old Mill Creek Road</span></li>
<li style="font-weight: 400;"><span style="font-weight: 400;">Bethel Street and Southampton Drive</span></li>
</ul>
<br />
<p><span style="font-weight: 400;">Motorists are asked to watch for workers in the roadway and be prepared to slow down. Flaggers will be present to assist motorists through the work zone. Motorists, nonmotorized transportation users and pedestrians are encouraged to find alternate routes if possible and to use extreme caution. Minor traffic delays are possible.  </span></p>
<br />
<p><span style="font-weight: 400;">For more information, visit CoMo.gov/PublicWorks/crack-sealing.</span></p></div>
<br />
<div class="content"></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br /><a href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=2357">Example Photo of 2019 Crack Sealing on residential</a></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public through  democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  #pressrelease table, #pressrelease th, #pressrelease td{
border: 0px;
  }
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
http://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at http://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>