<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<img src="https://www.como.gov/CMS/pressreleases/spaceholder.png" alt="" role="presentation" width="106" height="116" style="float: right; margin-right: 0px; margin-left:20px;">
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">August 3, 2022</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: John Ogan
<br />Public Information Specialist
<br />Public Works
<br />City of Columbia
<br />John.Ogan@CoMo.gov
<br />573.441.5494</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Road work scheduled for Aug. 8-10 on East Southampton Drive</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - Beginning Monday, Aug. 8, at 7 a.m., City of Columbia Public Works street crews will be performing repairs to the road on East Southampton Drive at its intersection with the west entrance to MU Health Care and the center entrance to Veterans United. East Southampton Drive will stay open at all times in both directions and no sidewalk closures will be necessary. However, motorists should expect delays when traveling through the area.<br /><br />The road work is being performed in response to a crack that has formed across all three lanes of East Southampton Drive resulting from concrete expansion due to high temperatures. Crews will be digging up and replacing the roadway in order to repair the crack. The affected concrete will be replaced in sections, providing motorists with passage through the work area at all times.<br /><br />Traffic control signs and flaggers will be present to assist motorist
 s through work zones as needed. Motorists and pedestrians should drive slowly and use caution when in the work zone and use the alternate entrances to Veterans United and MU Health Care if possible. Message boards are being installed on East Southampton Drive on Aug. 4 to inform motorists of the expected delays next week.<br /><br />All maintenance is scheduled to be completed by Wednesday, Aug. 10, at 5 p.m., weather permitting.</div>
<br />
<div class="content"></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br /><a href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=2879">Location of work area on East Southampton Drive</a></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public equitably through democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p><a href="https://www.como.gov/CMS/pressreleases/view.php?id=8138">View this press release on CoMO.gov or access a sharable link.</a></p><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived press releases can be viewed online at:
https://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at https://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>