<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<div style="float: right; margin-right: 0px; margin-left:20px; width:106px; height: 116px;"></div>
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">June 17, 2023</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: John Ogan
<br />Public Information Specialist
<br />Public Works
<br />City of Columbia
<br />John.Ogan@CoMo.gov
<br />573.239.1837</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Update on installation of accessible pedestrian signals at two West Worley Street intersections</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - Beginning Tuesday, June 20 at 7 a.m., Aplex Inc., contractor for City of Columbia Public Works, will begin work on the West Worley Street and West Boulevard phase of the Worley Street APS Project. Once work begins, sidewalk closures and intermittent driving lane restrictions and closures will be required at the intersection of West Worley Street and West Boulevard.<br /><br />This phase of the project includes the installation of new signal equipment including accessible pedestrian signals with countdown timers at the West Worley Street and West Boulevard intersection. The design also includes the reconstruction of several sidewalk ramps at the intersection corners to meet current Americans with Disabilities Act (ADA) requirements.<br /><br />The previous phase included the installation of new signal equipment including accessible pedestrian signals with countdown timers at the West Worley Street a
 nd Bernadette Drive intersection. The signals at West Worley Street and Bernadette Drive are now substantially complete and open to pedestrian and vehicular traffic.<br /><br />The previous press release can be found at <a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/view.php?id=8415">CoMo.gov/CMS/pressreleases/view.php?id=8415</a>. <br /><br />Due to manufacturing delays in obtaining signal cabinets, the work is now anticipated to be completed in mid-July, weather permitting.</div>
<br />
<div class="content"><strong>Location:</strong> <a style="white-space:nowrap" href="https://gocolumbiamo.maps.arcgis.com/apps/webappviewer/index.html?id=62b0c3219184457b88d19cf44ce1f4a3&find=West Boulevard @ Worley Street" target="_blank">West Boulevard @ Worley Street</a></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3010">West Worley Street and West Boulevard location plans</a><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3011">West Worley Street and West Boulevard intersection picture 1</a><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3012">West Worley Street and West Boulevard intersection picture 2</a><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3013">West Worley Street and Bernadette Drive intersection picture 1</a><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3014">West Worley Street and Bernadette Drive intersection picture 2</a></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public equitably through democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/view.php?id=8480">View this release on CoMO.gov or access a sharable link.</a></p><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived releases can be viewed online at:
https://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at https://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>