<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101"  style="margin-right: 5px;">
<div style="float: right; margin-right: 0px; margin-left:20px; width:106px; height: 116px;"></div>
  <div style="padding-top:40px;
          text-align:center;">
    <p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
  <p style="font-size: 120%; margin-top: -5px; font-weight:bold;">June 23, 2023</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: John Ogan
<br />Public Information Specialist
<br />Public Works
<br />City of Columbia
<br />John.Ogan@CoMo.gov
<br />573.239.1837</p>

</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px;  margin-bottom: 10px; font-weight: bold; font-size: 130%;">Update: Changes to pavement maintenance schedule for June 23-29</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - Changes have been made to the pavement maintenance schedule from the June 21 press release, located at <a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/view.php?id=8482">CoMo.gov/CMS/pressreleases/view.php?id=8482</a>. <br /><br />Beginning Friday, June 23, Capital Paving, contractors for the City of Columbia Public Works department, are still scheduled to perform mill and overlay pavement maintenance on the following City street:<br /><br />
<ul>
<li>Green Meadows Road between Forum Boulevard and Bethel Street</li>
</ul>
However, mill and overlay pavement maintenance on the following City streets has now been postponed until July:<br /><br />
<ul>
<li>Lea Verde Court between Willowcreek Lane and the end of the street</li>
<li>Willowcreek Lane between West Nifong Boulevard and the end of the street</li>
<li>Green Meadows Road between Grindstone Parkway and the Carter Lane roundabout</li>
<li>Green Meadows Road between Carter Lane and South Providence Road</li>
<li>Carter Lane between Foxfire Drive and Campusview Drive</li>
</ul>
Information on when these streets will receive pavement maintenance will be posted in a future press release.<br /><br />Beginning Monday, June 26, Capital Paving will now perform mill and overlay pavement maintenance on the following City streets:<br /><br />
<ul>
<li>Opal Drive from Amethyst Drive to North Wyatt Lane</li>
<li>Granite Drive from Coral Drive to the end of the street</li>
<li>Coral Drive from Granite Drive to Opal Drive</li>
<li>Amethyst Drive from Granite Drive to Sandstone Drive</li>
<li>Black Hills Drive from Wood Shire Drive to Mexico Gravel Road</li>
<li>Burbank Loop from Bullhead Lane to the end of the street</li>
<li>Bullhead Lane from Black Hills Drive to the end of the street</li>
<li>Woodshire Drive from Wood Lake Court to the west end of the street</li>
</ul>
Maintenance on these eight streets is scheduled to be completed by Thursday, June 29, at 7 p.m., weather permitting.<br /><br />As a reminder, crews plan to work daily from 7 a.m. to 7 p.m., but will not begin work until "no parking" signs have been posted at least 24 hours in advance. Please refrain from parking vehicles on signed streets during working hours.<br /><br />Temporary lane closures will be required. Traffic control signs and flaggers will be present to assist motorists through work zones as needed. Motorists and pedestrians should use caution in work zones and find alternate routes if possible.</div>
<br />
<div class="content"></div>
<br />
<div class="attachments"></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of  Columbia Vision<br>
  <em>Columbia is the best place  for everyone to live, work, learn and play.</em></p>
  <p>City of  Columbia Mission<br>
  <em>To serve the public equitably through democratic, transparent and efficient government.</em></p>
  </div>
  <p style="text-align:center;">-30-</p>
</div>
  <style>
   
  
#pressrelease{ margin:20px; margin-top: 0px;}
  .attachments{margin-top: -10px;}
@media print {
         body {font-size: 90%; margin: 0px; padding: 0px;}
        #pressrelease{ margin: 0px; }
      }
  </style><p><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/view.php?id=8488">View this release on CoMO.gov or access a sharable link.</a></p><p>______________________________________________________</p>

<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>

<p>Archived releases can be viewed online at:
https://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>

<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at https://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>