<div style="margin-top: 20px;"><img src="https://www.como.gov/CMS/pressreleases/citylogo-pw.png" alt="City of Columbia Missouri" width="175" height="101" style="margin-right: 5px;">
<div style="float: right; margin-right: 0px; margin-left:20px; width:106px; height: 116px;"></div>
<div style="padding-top:40px;
text-align:center;">
<p style="font-weight:bold; display: inline; line-height:150%; font-size: 115%;">P.O. BOX 6015 <br />COLUMBIA, MO 65205</p></div>
</div>
<div style="clear:both; text-align:center; padding-top: 20px;">
<p style="font-size: 150%; font-weight: bold;">FOR IMMEDIATE RELEASE</p>
<p style="font-size: 120%; margin-top: -5px; font-weight:bold;">August 6, 2025</p>
<p style="float:right; font-weight:bold; margin-bottom: 25px; font-size: 100%; text-align:right;">CONTACT: John Ogan
<br />Public Information Specialist
<br />Public Works
<br />City of Columbia
<br />John.Ogan@CoMo.gov
<br />573.239.1837</p>
</div>
<div style="font-size: 110%; line-height:150%;"><h1 style="clear:both; margin-top: 75px; margin-bottom: 10px; font-weight: bold; font-size: 130%;">Maple Meadows Drive to close for water main installation Aug. 11-15, part of Route K roundabout construction</h1>
<div class="content"><span style="padding-left: 50px;">(COLUMBIA, MO)</span> - Beginning at 7 a.m. Monday, Aug. 11, Maple Meadows Drive will be closed at West Route K while crews install a water main beneath the roadway.<br /><br />The closure is expected to remain in place until the morning of Friday, Aug. 15, when access to Route K from Maple Meadows Drive will be restored. <br /><br />After reopening, a portion of Maple Meadows Drive will be a compacted gravel base until phase two of the project begins in September, when concrete will be poured.<br /><br />During the closure, drivers should use Vermillion Drive to access Route K. Please use caution in work zones and watch for construction workers and equipment. Slowing down and staying alert helps keep everyone safe.<br /><br />Additional road closures will occur during phase two of roundabout construction, set to begin in September. Updates will be provided later in August. <br /><br />The Route K and Old Plank
Road roundabout project is expected to continue until early winter, weather permitting.</div>
<br />
<div class="content"></div>
<br />
<div class="attachments">This release has the following attachments:<br /><br /><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/downloadfile.php?id=3385">Closure Map for Maple Meadows Drive, Aug. 11-15</a></div>
</div>
<div id="footerline">
<div style="margin-top: 15px; margin-bottom: 20px; text-align:center;"><p>City of Columbia Vision<br>
<em>Columbia is the best place for everyone to live, work, learn and play.</em></p>
<p>City of Columbia Mission<br>
<em>To serve the public equitably through democratic, transparent and efficient government.</em></p>
</div>
<p style="text-align:center;">-30-</p>
</div>
<style>
#pressrelease{ margin:20px; margin-top: 0px;}
.attachments{margin-top: -10px;}
@media print {
body {font-size: 90%; margin: 0px; padding: 0px;}
#pressrelease{ margin: 0px; }
}
</style><p><a style="white-space:nowrap" href="https://www.como.gov/CMS/pressreleases/view.php?id=9341">View this release on CoMO.gov or access a sharable link.</a></p><p>______________________________________________________</p>
<p>You have received this message because you subscribe to the City of Columbia's Web Mail service. To view linked material click on provided links or copy and paste them into your browser's address menu.</p>
<p>______________________________________________________</p>
<p>Archived releases can be viewed online at:
https://www.como.gov/CMS/pressreleases/directory.php</p>
<p>______________________________________________________</p>
<p>If you would like to stop receiving messages, modify list options, or subscribe to other lists visit the Web Mail section of our Web site and follow the instructions provided at https://www.como.gov/Web_Mail/ </p><style>div{margin: 10px;}</style>